We are an ISO9001:2000 certified company in Shenzhen, China. From materials incoming to finished product out-going, we have a fully implemented quality control process to ensure lower re-work rate, lower wastage, higher efficient, short delivery term. From first article inspection to process capabilities study (PPAP), we guarantee production is stable and correctness. All mold steel/resin we used is strictly following customers' quality requirements, genuine steel purchased certificates and property specification of plastic raw materials are always available if customer made a clear request.
Mold quality is the foundation of our success, 90% of our new injection molds only take 1 time or 2 times testing before we put them into mass production or send to oversea customers. From materials incoming to finished work piece before mold assembly, we have a fully implemented quality control process to ensure lower re-work rate, lower wastage, high efficient and short delivery term. From first article inspection to process capabilities study (PPAP), we guarantee production is stable and correctness. All mold steel/resin we used is strictly following customers' quality requirements, steel purchased certificates and property specification of plastic raw materials are always available.
Our quality department processed 1 set CMM, 1 set 2D project and other measurement equipments, 4 experienced quality staff hired. We provide steel measurement inspection, first article inspection and full measurement reports.
Quality Policy :
Full participation entire process control omni-directional improvement efforts pursuit of product zero defects.